Department of Energy - Department of Energy and FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois

Department of Energy - Department of Energy and FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois: "August 19, 2010
Department of Energy and FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois
Washington, DC - At a meeting today in Chicago, officials from the Department of Energy, the state of Illinois, Ameren, Babcock & Wilcox, American Air Liquide and the FutureGen Alliance discussed the next steps for the FutureGen 2.0 carbon capture and storage project in Illinois. The project remains on track for obligation before the end of September. Preparations will then begin for the repowering of Unit 4 at the Ameren facility in Meredosia, with construction set to begin in 2012. At the same time, following DOE best practices, a site selection process will be conducted to locate a site for the carbon sequestration research, repowering workforce training facility, visitor center, and long term CO2 repository."

No comments:

Post a Comment

Comment?