JEFFERSON CITY, Mo.: Regulators reject challenge to Ameren power rates | National Business News | The Bellingham Herald: "Ameren said it plans to convert two of the four coal-fired units at its Meramec Energy Center south of St. Louis to natural gas by 2016 and then follow through with previously announced plan to shut down the site by 2022.
Ameren said it plans to close its Sioux Energy Center north of St. Louis, which has two coal-fired units, by 2033.
The lost production capacity from the Sioux Energy Center largely would be replaced by new facilities powered by natural gas and wind. Smaller amounts of energy also would come from new solar and hydroelectric plants and from landfill-gas generation.
"
'via Blog this'
No comments:
Post a Comment
Comment?